The Best Season to Paint a House Exterior in Colorado Springs

Late spring to early fall is the window, but the daily forecast matters more than the month.

Veteran-owned Family-run since 1990 650+ Google reviews

Key numbers

103 verified hail storms with stones of 1.5 inches or larger reached El Paso County, which includes Colorado Springs, from 2000 to 2025 in the storm records we keep; the largest measured 4.5 inches (softball size) on July 13, 2011 (NOAA NCEI).

Hail storms by decade, 2000 to 20252000s: 35, 2010s: 44, 2020s: 24
Source: Storm library: El Paso County hail history
Largest hail4.5 in. (softball), July 13, 2011
Source: NOAA NCEI
Costliest hail storm$352.8 million insured losses (2016 dollars), July 28, 2016
Source: RMIIA
15NAHB's 2007 study says interior and exterior paint can last 15 years or longer, though homeowners often repaint sooner.
Source: National Association of Home Builders / Bank of America Home Equity, 2007
7Paints and coatings for stucco should have a perm rating of 7 or higher so the wall can dry, per the Northwest Wall & Ceiling Bureau.
Source: Northwest Wall & Ceiling Bureau, undated (posted 2021)
About 28Sika recommends stucco reach pH 9.5 or less and fully cure, normally about 28 days, before painting.
Source: Sika USA (manufacturer), undated

A storm counts when the library lists El Paso County among the areas it hit. Each hail size is the storm's largest report, which may have fallen in a neighboring county, and insured losses cover every area the storm hit.

In Colorado Springs, the best time to paint a house exterior is late spring through early fall, on dry days when air and surface temperatures stay inside the paint’s rated range and above the dew point for the next day or two. Paint makers set the limits: Sherwin-Williams rates Duration Exterior for application down to 35°F, Behr lists Premium Plus Exterior for 35 to 90°F with at least four hours in that range afterward, and Sherwin-Williams advises keeping fresh paint above the dew point for 48 hours. Here, the real risks are cold nights with dew, strong midday sun and summer afternoon storms, so we pick each painting day by the forecast. Integrity Roofing and Painting uses Sherwin-Williams and Behr exterior paints.

Season by season

SeasonStrengthsRisksHow we handle it
SpringMild days, low humidityCold nights and dew, late snow, windStart after dew burns off; stop early for dry time
SummerLong, warm drying daysHot sun on walls, afternoon storms, hailFollow the shade; finish walls by early afternoon
FallSteady weather, cooler sunShorter days, first freezesWatch overnight lows; earlier finish times
WinterOccasional mild stretchesCold surfaces, little drying timeTouch-ups only, on rated products and dry days

The limits that matter more than the month

Temperature. Air and surface temperatures must be inside the paint’s range when it goes on and for hours afterward. A wall in shade on a cold morning can be much colder than the air reading.

Dew point. When a warm afternoon gives way to a cool night, dew forms on fresh paint and can stop it curing properly. Sherwin-Williams advises staying above the dew point for at least 48 hours. On spring and fall days here, that means starting after the morning dew is gone and stopping early enough for several hours of dry time before evening.

Direct sun. Purdue Extension’s paint-failure guide, written with the USDA Forest Products Laboratory, says temperature blisters form when fresh paint is heated by direct sun, especially dark colors and thick coats. We paint west walls in the morning and east walls in the afternoon. Our high-altitude UV page explains why sun is harder on paint here.

Rain. Fresh paint needs dry time before rain. Product data sheets list dry-to-touch and recoat times, and those assume 77°F and 50 percent humidity; cool or damp days stretch them.

Colorado Springs weather notes

Conditions differ across the city: Monument Hill and Black Forest run cooler and catch more late snow than Fountain or Security-Widefield, so their painting season starts later and ends sooner. HOA color approvals in neighborhoods with covenants can take weeks, so submit colors before booking a date.

  • Hail season runs through late spring and summer. If a storm chips paint, hold the repaint until after the claim inspection, if you file one; see Colorado Springs hail damage.
  • Wind carries dust onto wet paint and makes spraying impractical. We roll or brush on windy days, or reschedule.
  • Dry air helps paint dry, but it also dries it fast in sun, which is another reason to stay in the shade.

Planning around other exterior work

Paint goes on last. Roof replacement, gutter work, siding replacement and window replacement should be finished first, so new flashing, trim and caulk are painted once. Read when to repaint to judge whether your house is due, and our Colorado Springs painting page for the full service.

Book your painting season early

Integrity Roofing and Painting is veteran-owned and family-run since 1990, an Owens Corning Platinum Preferred roofing contractor with 650+ Google reviews. Call (719) 488-2800 or book a free walkthrough; we respond the same business day.

Sources: Sherwin-Williams, Duration Exterior Acrylic Latex; Sherwin-Williams, Exterior product application FAQs; Behr, Premium Plus Exterior Flat Paint No. 4050 data sheet; Cassens and Feist, Paint Failure Problems and Their Cure (Purdue NCR-133).

How We Schedule an Exterior Paint Job, Step by Step

We book the season, then pick each day by the forecast and the paint's limits.

1

Schedule Your Free Inspection

Call or book online. We reach out the same business day, confirm a time, and a Client Solutions Representative researches your property so they arrive prepared.

2

Thorough Roof Inspection

Your rep inspects the attic, roof surface, flashing, gutters, and the rest of the exterior, and documents what they find with detailed photos so nothing gets missed.

3

Honest Assessment & Options

We walk through exactly what we found and present Good, Better, and Best options with upfront pricing. If the roof does not need work, we tell you that.

4

Clear Paperwork & Claim Documentation

You get a written contract that spells out the scope. If you are filing an insurance claim, the claim stays yours: we provide photo documentation and make sure nothing gets missed in the scope.

5

Expert Installation

Our crews install to manufacturer specifications under superintendent oversight, with quality checks and photo documentation at every stage.

6

Final Walkthrough & Warranty

We clean the site, walk you through the completed work, register your manufacturer warranty, and stay available for anything down the road.

Frequently Asked Questions

Can you paint a house in winter in Colorado Springs?

Sometimes, on mild, dry stretches. Some exterior paints are rated down to 35°F, including Sherwin-Williams Duration Exterior and Behr Premium Plus Exterior, but the surface also has to stay above the dew point while the paint dries, and short winter days leave little drying time before evening. Most full exterior repaints are scheduled for the warmer months.

Is summer the best time to paint here?

Summer has the longest drying days, but strong midday sun and afternoon thunderstorms are the risks. Painting each wall while it is in shade and stopping well before storms build avoids most problems.

How long after painting does it need to stay dry?

Check the product. Behr's data sheet for Premium Plus Exterior says to apply between 35 and 90°F and stay in that range for at least four hours after application, and lists two hours to recoat at 77°F and 50 percent humidity. Sherwin-Williams advises staying above the dew point for at least 48 hours.

Should I paint before or after a new roof?

After. Roof work disturbs the siding at roof-to-wall joints and can scuff fresh paint. Painting after the roofers finish lets flashing and paint lines meet cleanly.

Get a Free Painting Estimate

Share a few details about your home and we will set up a time to walk the project with you and price it clearly. We'll reach out the same business day.

Veteran-owned Family-run since 1990 Owens Corning Platinum 650+ Google reviews No obligation Financing available

Prefer to talk? Call (719) 488-2800

Request Sent!

Thanks. We'll review your request and reach out with the next step. For faster help, call (719) 488-2800.

We'll reach out the same business day. Your info stays with us, never sold or shared.