Integrity Roofing and Painting
New Roof Installation

What Happens During a New Roof Installation in Colorado Springs?

Install day, step by step: what our crew does, what PPRBD inspects, and how to get your home ready.

Veteran-owned Family-run since 1990 650+ Google reviews

Key numbers

103 verified hail storms with stones of 1.5 inches or larger reached El Paso County, which includes Colorado Springs, from 2000 to 2025 in the storm records we keep; the largest measured 4.5 inches (softball size) on July 13, 2011 (NOAA NCEI).

Hail storms by decade, 2000 to 20252000s: 35, 2010s: 44, 2020s: 24
Source: Storm library: El Paso County hail history
Largest hail4.5 in. (softball), July 13, 2011
Source: NOAA NCEI
Costliest hail storm$352.8 million insured losses (2016 dollars), July 28, 2016
Source: RMIIA

A storm counts when the library lists El Paso County among the areas it hit. Each hail size is the storm's largest report, which may have fallen in a neighboring county, and insured losses cover every area the storm hit.

A new roof installation in Colorado Springs takes one to two days on the roof for most asphalt replacements, and it follows a fixed order: permit, material delivery, landscape protection, tear-off to the deck, decking repairs, ice and water shield and underlayment, flashing, shingles, ridge ventilation, cleanup, and a PPRBD final inspection. Here is what happens at each stage and what you will see from the ground.

Before install day

  • Permit. We pull the PPRBD permit. Materials are not delivered before it is issued, because that is a code violation.
  • Pre-construction checklist. We confirm your material, color, and any decking allowance in writing before delivery.
  • Yard sign. We place one unless your HOA prohibits it.

Install day, step by step

  1. Protect the property. Landscaping and the areas around the house are covered before tear-off starts.
  2. Tear-off. Old shingles, valley metal, drip edge, and pipe boots come off to the deck. PPRBD does not allow new asphalt shingles over old ones.
  3. Decking. We replace soft or rotted sheathing. Old plank decking with gaps over a quarter inch must be re-decked or overlaid with 3/8-inch or thicker sheathing.
  4. Ice and water shield and underlayment. Our install system includes ice and water shield, then felt or synthetic underlayment. Above 7,000 feet, PPRBD requires an ice barrier at the eaves reaching at least 24 inches inside the exterior wall line.
  5. Drip edge and starter. Drip edge at the eaves and rakes, which PPRBD requires, and a windstorm starter strip.
  6. Flashing. New valley, wall, and pipe flashing.
  7. Shingles, hip, and ridge. Nailed in the manufacturer’s nailing zone.
  8. Ventilation. Ridge and intake vents balanced for your attic.
  9. Cleanup. Debris and nails are cleaned up from the roof, gutters, driveway, and yard.

The full checklist is in the Integrity Roofing System.

Roofers in orange shirts and safety harnesses installing black ice and water shield along the eave of a bare roof deck
Ice and water shield at the eave, installed right after tear-off.

After install day

The contractor who pulled the permit must schedule the PPRBD final inspection, so we do. After a big hail season, PPRBD says inspections are not same day or next day. Once it passes, we walk the roof with you, register the manufacturer warranty, and give you the paperwork.

Choosing what goes on the roof

Install steps change with the material: tile adds a dry-in inspection and battens, and metal has its own underlayment and trim. Compare materials on our residential roofing page, read about architectural shingles, or see whether you need a full roof replacement at all.

Who will be on your roof

Integrity Roofing and Painting is veteran-owned, family-run since 1990, and an Owens Corning Platinum Preferred contractor. Meet our Colorado Springs team, or book a free inspection to get started.

Sources: PPRBD, Reroof Guidelines (rev. 03/05/2024); PPRBD, Hail & Disaster Information.

Photos From Our Projects

New underlayment installed on a roof deck before tile goes on
New tile underlayment installation, Colorado Springs area
Roofers laying terracotta tile over new underlayment
Crew installing a tile roof, Colorado Springs area
Wood battens and underlayment exposed during a tile roof repair
Tile battens and underlayment during a repair, Colorado Springs area
Stone-coated steel panels and underlayment along a roof valley during installation
Stone-coated steel installation in progress, Colorado Springs area

What to Expect Before and After Install Day

Install day is step 5. Here is how the whole project fits together.

1

Schedule Your Free Inspection

Call or book online. We reach out the same business day, confirm a time, and a Client Solutions Representative researches your property so they arrive prepared.

2

Thorough Roof Inspection

Your rep inspects the attic, roof surface, flashing, gutters, and the rest of the exterior, and documents what they find with detailed photos so nothing gets missed.

3

Honest Assessment & Options

We walk through exactly what we found and present Good, Better, and Best options with upfront pricing. If the roof does not need work, we tell you that.

4

Clear Paperwork & Claim Documentation

You get a written contract that spells out the scope. If you are filing an insurance claim, the claim stays yours: we provide photo documentation and make sure nothing gets missed in the scope.

5

Expert Installation

Our crews install to manufacturer specifications under superintendent oversight, with quality checks and photo documentation at every stage.

6

Final Walkthrough & Warranty

We clean the site, walk you through the completed work, register your manufacturer warranty, and stay available for anything down the road.

Frequently Asked Questions

How should I prepare my home for install day?

Move cars out of the garage and driveway, take fragile items off walls that share the roof framing, move patio furniture and grills away from the house, and keep pets inside or away. We protect landscaping, but tell us about anything delicate near the walls.

Why can't the shingles be delivered early?

PPRBD considers stocking roofing materials on the driveway or roof to be the start of the project, and it is not allowed before the permit is issued. Violations bring a triple permit fee and a stop work order, so delivery waits for the permit.

Do I need to be home on install day?

No, but someone should be reachable by phone in case the crew finds damaged decking that changes the scope. We confirm any change with you before doing it.

What does the final inspection check?

The PPRBD inspector confirms the roof matches the permit and code. For typical asphalt and direct-to-deck metal shingle roofs there is no mid-roof inspection; tile roofs add a dry-in inspection before tile goes on.

Start With a Free Roof Inspection

Honest findings, photos of what we see, and clear options before you commit to anything. We'll reach out the same business day.

Veteran-owned Family-run since 1990 Owens Corning Platinum 650+ Google reviews No obligation Financing available

Prefer to talk? Call (719) 488-2800

Request Sent!

Thanks. We'll review your request and reach out with the next step. For faster help, call (719) 488-2800.

We'll reach out the same business day. Your info stays with us, never sold or shared.