Integrity Roofing and Painting
Building Code Data

Denver Building Code Data for Roofs (2024 I-Codes)

Adopted code, permits, loads and inspections for a Denver reroof, from official sources.

Veteran-owned Family-run since 1990 650+ Google reviews

Denver enforces the 2025 Denver Building and Fire Code, which is based on the 2024 I-codes, and you need a permit once a roof repair passes 10% of the roof or two squares, whichever is smaller. An ice barrier is not required, and a roof with two or more layers must be torn off to the deck.

General information, read from the official sources listed below on 2026-10-28. Codes and local policies change, so confirm the rules for your address with the building department before work starts.

Denver roof code data table

ItemDenver
Adopted IRC edition 2025 Denver Building and Fire Code, based on the 2024 I-codes. The city page does not name the IRC edition separately.
Source: Denver Building Codes, Policies and Guides
Adopted IBC edition 2025 Denver Building Code, based on the 2024 IBC. The energy code incorporates the 2021 IECC.
Source: Denver Building Codes, Policies and Guides
Adoption or effective date Adopted June 13, 2025; 2nd printing adopted November 24, 2025. The city page gives the effective date as December 31 without a year.
Source: Denver Building Codes, Policies and Guides
Roofing amendments and local policies Roofing Guide (updated 4/11/2024, before the 2025 code): no continuous opening between boards over 1/2 in; for asphalt, no opening over 6 sq in, with smaller ones covered by 26-gauge metal; shingles labeled to ASTM D7158, or D3161 if outside D7158 scope; exposed uninsulated cavities insulated to R-30ci above or R-38 flat / R-49 attic below the sheathing; coatings need no permit.
Source: Denver Roofing Guide and Checklist (updated 4/11/2024)
Ice barrier rule Not required (Denver Table R301.2: No).
Source: Denver Roofing Guide and Checklist (updated 4/11/2024)
Ground snow load 35 psf ground snow load.
Source: Denver Roofing Guide and Checklist (updated 4/11/2024)
Design wind speed Minimum shingle rating by zone: 115 mph east of Federal Blvd., 125 mph from Federal to Sheridan, 140 mph from Sheridan to Kipling.
Source: Denver Roofing Guide and Checklist (updated 4/11/2024)
Reroof permit trigger Repairs over 10% of the roof or two squares, whichever is smaller (5% for buildings of 25,000 sq ft or more). Every new penetration needs a permit. Partial roofs may be replaced only to a natural edge, not partial slopes.
Source: Denver Roofing Guide and Checklist (updated 4/11/2024)
Layers allowed Where two or more layers of any covering exist, the roof must be removed to the deck. Over a single layer, the IRC recover limits apply.
Source: Denver Roofing Guide and Checklist (updated 4/11/2024)
Wildfire / WUI code status Not fully verified: Not stated in the sources read for this page. Ask the building department.
Inspection requirements One- and two-family asphalt reroofs: no pre-inspection (205), mid-roof (206) only if needed, final roof inspection (201) required. Tile and metal: mid-roof and final. Attic venting is not inspected on reroofs.
Source: Denver Roofing Guide and Checklist (updated 4/11/2024)
Permitting office Denver Community Planning and Development, building codes and permits.
Source: Denver Building Codes, Policies and Guides

What it means for a homeowner reroofing in Denver

Denver measures a repair against the whole roof. On a 25-square house, 10% is 2.5 squares, so the two-square cap is the smaller number and decides it: replacing more than 200 square feet of shingles needs a permit. Replacing whole roof planes is allowed under a permit only if the new roofing stops at a natural edge, never mid-slope.

Your street address sets the wind rating your shingles must carry. A bungalow east of Federal Boulevard needs a 115 mph minimum rating, while a home between Sheridan and Kipling needs 140 mph. Ask the roofer which zone the quote assumes.

Denver is one of the few Front Range jurisdictions that does not require an ice barrier, and it does not inspect attic venting on a reroof. If the old roof had no insulation in the rafter cavity and the sheathing gets exposed, though, the energy rule forces insulation, which is a real cost on older flat and low-slope roofs.

Common inspection failures in Denver

These are items the building department's own code or handouts say it checks or rejects. No public data ranks how often each one fails, so the order means nothing.

  • Repair grew past two squares without a permit.
  • A partial reroof ended mid-slope instead of at a natural edge.
  • Shingle wrapper lacks the ASTM D7158 (or D3161) wind label for the zone.
  • Board gaps over 1/2 in, or asphalt-roof openings over 6 sq in, left uncovered.
  • A new skylight, pipe or solar penetration added without a permit.
  • Exposed uninsulated cavity closed up without the required insulation.
  • No proof of the asbestos inspection CDPHE rules require.

Steps to permit a reroof in Denver

  1. Measure the work against 10% of the roof and two squares to see if a permit is needed.
  2. Find the wind zone (Federal, Sheridan, Kipling) and confirm the shingle label matches.
  3. Check whether the roof has two or more layers; if so, plan a full tear-off.
  4. List any new penetrations so they go on the permit.
  5. Book the final roof inspection (code 201) when the job is done.

Related pages

Hail history by ZIP in Denver: 80220 (Denver), 80238 (Denver)

Sources

  1. Denver Building Codes, Policies and Guides
  2. Denver Roofing Guide and Checklist (updated 4/11/2024)

Compiled by Integrity Roofing and Painting, roofing Colorado homes since 1990 (36 years in business). We are an Owens Corning Platinum Preferred contractor with 650+ Google reviews, and our repair scopes follow the local code and the manufacturer's installation and warranty requirements. We do not issue permits or rule on code; the building department does.

Denver roof code questions

Does replacing one hail-damaged slope in Denver need a permit?

If the slope is more than 10% of the roof or more than two squares, whichever is smaller, yes. Denver also allows a partial roof under a permit only when it ends at a natural edge of the roof, not partway across a slope.

Will a Denver inspector check my attic vents during a reroof?

No. The Roofing Guide says venting is not inspected on reroofs, but it must still meet the code in effect when the house was built. Vents can be added to meet the shingle manufacturer warranty.

Where are the Denver wind zone lines for shingle ratings?

Federal Boulevard, Sheridan Boulevard and Kipling Street. The minimum is 115 mph east of Federal, 125 mph from Federal to Sheridan and 140 mph from Sheridan to Kipling, per the Roofing Guide. Shingles must be labeled to ASTM D7158, or D3161 if the brand is outside D7158.

Does a roof coating need a Denver permit?

No. The Denver Roofing Guide lists roof coatings as work that does not require a permit. New roof penetrations, such as a skylight, pipe or solar mount, always do.

Start With a Free Roof Inspection

Honest findings, photos of what we see, and clear options before you commit to anything. We'll reach out the same business day.

Veteran-owned Family-run since 1990 Owens Corning Platinum 650+ Google reviews No obligation Financing available

Prefer to talk? Call (303) 209-0152

Request Sent!

Thanks. We'll review your request and reach out with the next step. For faster help, call (303) 209-0152.

We'll reach out the same business day. Your info stays with us, never sold or shared.